Client: Transport NSW
Cost of project: $460k
Contract: Lump Sum
Duration of project: 16 weeks
Project Type: Commercial
Scope:
- Excavations of 400m2 of existing concrete floor within train maintenance yard and pour new 50mpa reinforced concrete.
- Installation of structural steel to carriage inspection and maintenance pits in order to reinforce structural integrity of the void for forklift movement over the top
- Façade rectification works including window restoration, corroded fixing removal and localised repointing works.